Bell Middle School Sun Tunnels
General Contractor: Golden Triangle Construction Thirteen Velux Sun Tunnels to be installed at Gertrude Bell Middle School Groundbreaking ceremony for a new classroom addition took …
From Coast to Coast
General Contractor: Golden Triangle Construction Thirteen Velux Sun Tunnels to be installed at Gertrude Bell Middle School Groundbreaking ceremony for a new classroom addition took …
Twenty Velux 22″ Sun Tunnels are being installed at the high school. Himmelman Construction, the general contractor, hired Skylight Specialists to install the twenty Velux …
Damage skylights need replacements. Skylight Specialists, Inc. was asked to replace two leaking, curb mounted, dome skylights. The two were covered with tarps and upon removing …
Yuma Middle School will have 12 Velux Sun Tunnels Installed. The Neenan Company has hired Skylight Specialists, Inc. to install twelve Velux Sun Tunnels on …
Thirty Velux Commercial 22″ Sun Tunnels Installation Skylight Specialists, Inc. was hired by Himmelman Construction Inc. to install thirty Velux TCC 022 Sun Tunnels at …
Prairie Crossing Elementary School ridgelights are leaking. The General Contractor, GE Johnson Construction Co., has hired Skylight Specialists, Inc. to repair some problem ridgelight skylights …
Two Hundred Forty Nine Skylights Replaced in Two Days. The Lincoln School of Technology moved into a former Samsonite warehouse, a 212,000-square-foot facility in northeast …
Working with existing steel support beams, Skylight Specialists provided and installed a 20 foot by 46 foot U-Lite Canopy manufactured by CPI Daylighting.
The Commercial Division of Skylight Specialists, Inc. will be installing (23) Velux 22″ Sun Tunnels as a part of the project. No ordinary tube light to begin with…
Expansion and renovation project is underway. Holy Family High School is a Catholic, college preparatory, Archdiocesan, coeducational high school operating grades 9 through 12 in Broomfield, …