Colorado Springs Airport | Phase Two
The July 28, 2016 hailstorm that smashed Colorado Springs wreaked havoc on the airport’s original canopies and walkways. The second phase is to replace the old, wide-cell, polycarbonate product with…
From Coast to Coast
The July 28, 2016 hailstorm that smashed Colorado Springs wreaked havoc on the airport’s original canopies and walkways. The second phase is to replace the old, wide-cell, polycarbonate product with…
The July 28, 2016 hailstorm that smashed Colorado Springs wreaked havoc on the airport’s original skylights. The first phase is to replace the…
The July 28, 2016 hailstorm that smashed Colorado Springs damaged the old wide-cell polycarbonate and fiberglass skylights at the airport.
May 8, 2017 will rank as the most expensive catastrophe in state history. Commercial properties weren’t included in the $1.4 billion estimated hail damages—they were certainly not excluded from…
The skylights on these units have reached their lifetime limit and are leaking. The management company in charge of maintenance covered…
We will supply and install one twenty two unit VMS Ridgelight with electric roller blinds. The system includes building management integration into the HVAC system for…
Furnished and installed one CPI Daylighting Direct2Fab Quadwall pyramid skylight with flashing. D2F is a fast delivery program for…
Construction began in February 2016. Staff anticipate that the first units will be ready for occupancy by April 2017. The remaining units will then be…
An onsite skylight survey and inspection was made on 5/1/2017 by Skylight Specialists, Inc., represented by Dan Packard.
Each building has three barrel vault skylights that were severely damaged earlier this year during one of Colorado’s violent hailstorms and require…